Vopak Terminals Singapore Pte Ltd.

Client : Vopak Terminals Singapore Pte Ltd.

contractor: Overseas Technical Engineering and Construction Pte Ltd (A member of Dialog Group)

Project Name/Description:Vopak Penjuru Phase 3 Project – EPCC of 22 numbers of Storage Tanks.

Project Background: Overseas Technical Engineering and Construction Pte Ltd (A member of Dialog Group) was awarded a contract by Vopak Terminals Singapore Pte Ltd to Design and Construct 22 nos of Storage Tanks at Vopak Penjuru.  This very challenging and tight schedule project's major phase was completed in a record 11 months in Dec 2013.  The TOP (Temporary Occupation Permit) was obtained on 9 Dec 2013 and the tanks were ready to receive product in Dec 2013.   The project covers Engineering, Procurement, Construction and Pre-Commissioning of the full facilities.  The minor phase consisting of 2 nos Truck Loading Bays and weighbridge is on track to be completed in April 2014.   Dialog OTEC is proud to be a part of this major work and delivered results ensuing in a very satisfied client for this project.

Project Timeline: Jan 2013 to April 2014