Kertih Terminals was the first Centralised Tankage Facilities (CTF) project in Malaysia that DIALOG embarked on in 2000. The facility consists of 41 petrochemical tanks with a storage capacity of 400,000 cbm and five berths for vessels.
The services offered are product blending, drumming, tank truck cleaning and loading, heating and nitrogen blanketing systems. Annually, the terminal handles a throughput of about 2.5 million tonnes.
Located at the southern tip of Peninsular Malaysia and spanning 1,200 acres, Pengerang Deepwater Terminal (PDT) is part of DIALOG’s vision of a 'Rotterdam of the East'.
DIALOG Terminals Langsat (DTL) comprises three-terminal facilities with a total storage capacity of 855,000 cbm, supported by 7 marine berths and 5 truck loading bays.
Speak to our team or send us a message using the Contact Us form.