Conceptualised in 2007 as part of DIALOG's vision of a 'Rotterdam of the East', PDT is located strategically at the southern tip of Peninsular Malaysia. With its proximity to international shipping lanes, PDT is on track to becoming a regional downstream hub for the oil, gas and petrochemical industries.
Spanning 1,200 acres with three terminal facilities (Phase 1, 2 & 3A) and 19 berths, PDT is naturally sheltered and is unique for its deepwater feature with the capability to operate fully-laden Very Large Crude Carriers (VLCCs) and Q-Max for Liquified Natural Gas (LNG).
Kertih Terminals is a Centralized Tankage Facilities (CTF) consists of 41 petrochemical tanks with a storage capacity of 400,000 cbm and five berths for vessels.
DIALOG Terminals Langsat (DTL) comprises three-terminal facilities with a total storage capacity of 855,000 cbm, supported by 7 marine berths and 5 truck loading bays.
Speak to our team or send us a message using the Contact Us form.